Offsite is a viable construction method. For leftover infill development sites, it is an opportunity.
Building as much offsite as possible To deliver Lady Liberty Academy in time and on budget, we needed to rethink our entire design process. Building as much offsite as possible
Missing teeth Offsite construction reduced time and site supervision, significantly lowering the overall cost of The Stack – 4857 Broadway and enabling the building to generate income sooner. Missing teeth
Precast platforms To connect the four milieus of the Cary Leeds Center we proposed an elevated platform. Precast platforms
The Stack Time Lapse Seven stories. Fifty-six modules. Twenty-eight apartments. Thirty-seven thousand square feet. Stacked in nineteen days. The Stack Time Lapse